27
Other items to check during opening
procedures
These steps do not necessarily need to be
performed as part of the daily opening
procedures. The following is a list of areas to
check on the Flavor Burst
®
system during
opening procedures. These areas should be
checked and adjusted if necessary.
1. Ensure that the sanitizer tank has plenty of
sanitizer solution that is no older than 28
days. Refill if necessary.
2. Ensure that desired flavors are installed and
that none of the flavor bags are empty.
Replace flavors according to instructions if
necessary.
3. Ensure that the flavor level and the multi-
flavored timing are set to a desired level.
Make adjustments according to instructions
according to the operator’s preference.
Summary of Contents for Stoelting Flavor Burst STL-80SS-DLX
Page 2: ......
Page 9: ...6 PAGE INTENTIONALLY LEFT BLANK ...
Page 11: ...8 General System Overview Figure 1 ...
Page 13: ...10 Outer Cabinet Continued Figure 2 ...
Page 15: ...12 Inner Cabinet Continued Figure 3 ...
Page 19: ...16 Syrup Pump and Related Parts Figure 5 ...
Page 21: ...18 Sanitizer Pump and Related Parts Figure 6 ...
Page 25: ...22 Spare Parts Kit Figure 8 ...
Page 26: ...23 PAGE INTENTIONALLY LEFT BLANK ...
Page 38: ...35 PAGE INTENTIONALLY LEFT BLANK ...
Page 70: ...67 PAGE INTENTIONALLY LEFT BLANK ...
Page 79: ......
Page 80: ......