Eccellenza Café – Service Manual
40
August 5, 2013
12.
Reconnect the inline wiring connector at the bottom of the power supply.
13.
With the four screws loosened on the terminal block at the top of the power supply,
insert the wiring terminal under the screws and tighten the screws to secure the
terminals in place.
a.
Terminal Screw #1 – Red wire bundle
b.
Terminal Screw #2 – Red wire (for changer unit)
c.
Terminal Screw #3 – Blue wire (for changer unit)
d.
Terminal Screw #4 – Blue wire bundle (includes a white and a black wire)
14.
Re-install the powder wall and the powder dispensers.
15.
Re-install the machine’s left side panel and its top panel.
16.
Reconnect the service cord to the wall outlet.
17.
Switch the machine power on and test the equipment operation.