1.
Connect strain relief to the external
cable and clip into the mounting
plate aperture.
2.
Fit cover.
3.
Pivot the control unit upwards.
Front panel installation
1.
Hang the front panel to the wall
mounting frame by the appropriate
hook.
2.
Press down the front panel at the
bottom.
3.
Insert the screw at the top of the
boiler.
Note
The outer case forms a seal with
the combustion box. It must there-
fore be securely fitted with the
screw provided.
Electrical connections
(cont.)
46
Installation
58
62
670
GB