A
Installation template
B
Observe the minimum slope of 3°
(5mm/m) towards the boiler
1.
Position the installation template
on the wall.
2.
Mark wall plug holes and balanced
flue pipe opening.
Preparations for boiler installation
(cont.)
30
Preparing for installation
58
62
670
GB