Unpacking the appliance
The appliance is supplied in 2 sepa-
rate packages plus any optional flue
packages. Check the availability and
contents of each package before
commencing the installation.
Boiler package
Combi boiler
&
Boiler (assembled)
&
5 shut-off valves
&
Wall mounting fixture
&
2 wall plugs and 2 screws
&
Installation template
System boiler
&
Boiler (assembled)
&
3 shut-off valves
&
2 connection elbows
&
Wall mounting fixture
&
2 wall plugs and 2 screws
&
Installation template
Wall mounting bracket installation
Important: Before installing the appliance, check that the chosen position is sui-
table, adequate installation clearances are available and that the requirements
for flue terminal position are satisfied.
Preparations for boiler installation
29
Preparing for installation
58
62
670
GB
Installation