Terminating into an external purpose
made soakaway
A
7
22 mm plastic condensate pipe
B
External length of pipe 3 m max.
C
Open end direct into gully, below
ground but above water level
Terminating into the rainwater system
A
7
22 mm plastic condensate pipe
B
Internal soil and vent stack
Filling the siphon with water
Fill a minimum of 0.3 l of water into the
boiler connect kit flue outlet.
!
Important information
At initial start-up, flue gas may
be emitted from the condensate
drain.
Fill the siphon with water before
start-up.
Installing the boiler and making all connections
(cont.)
38
Installation
58
62
670
GB