36
5608 741 - 04
Vitodens Rigid and Flex Venting Systems Installation
Direct Venting (Two-pipe System)
Vent Requirements - Stainless Steel
(continued)
Additional requirements for stainless steel vent pipe material
(continued)
Exhaust vent termination options (vertical installation)
Supplier
Boiler Model
Stainless Steel Slip
Joint Starter Adaptor
Vertical Termination
Coupling with Screen
Flexmaster WB1B 26, 35, WB2B 19, 26, 35
B2TA 19, 35, B2TB 19, 35,
B2HA 19, 28, 35, B2HB 19, 26, 35
WB2B 45, 60, B2HA 45, 60, B2HB 45, 57
WB2B 80, 105 B2HA 80, 88, 100, 112, 150
3 in. 2SVSVB03
3 in. 2SVSVB03
3 in. 2SVSVB03
3 in. 2SVSVB03
4 in. 2SVSVB04
3 in. 2SVST03
3 in. 2SVST03
3 in. 2SVST03
3 in. 2SVST03
4 in. 2SVST04
Heat-Fab
WB1B 26, 35, WB2B 19, 26, 35
B2TA 19, 35, B2TB 19, 35, B2HA 19, 28, 35,
B2HB 19, 26, 35
WB2B 45, 60, B2HA 45, 60, B2HB 45, 57
WB2B 80, 105 B2HA 80, 88, 100, 112, 150
3 in. 9301VSMN
3 in. 9301VSMN
3 in. 9301VSMN
3 in. 9301VSMN
4 in. 9401VSMN
3 in. 9392
3 in. 9392
3 in. 9392
3 in. 9392
4 in. 9492
ProTech
WB1B 26, 35, WB2B 19, 26, 35
B2TA 19, 35, B2TB 19, 35, B2HA 19, 28, 35,
B2HB 19, 26, 35,
WB2B 45, 60, B2HA 45, 60, B2HB 45, 57
WB2B 80, 105 B2HA 80, 88, 100, 112, 150
3 in. 300568
3 in. 300568
3 in. 300568
3 in. 300568
4 in. 300569
3 in. 300186
3 in. 300186
3 in. 300186
3 in. 300186
4 in. 300187
Security
Chimneys
WB1B 26, 35, WB2B 19, 26, 35
B2TA 19, 35, B2HA 19, 28, 35
B2TB 19, 35, B2HB 19, 28, 35
WB2B 45, 60, B2HA 45, 60, B2HB 45, 57
WB2B 80, 105 B2HA 80, 88, 100, 112, 150
3 in. CTX-V3
3 in. CTX-V3
3 in CTX-V3
3 in. CTX-V3
4 in. CTX-V4
Contact
supplier
Other exhaust vent termination options (horizontal installation)
Supplier
Boiler Model
Termination Elbow with Screen
90° or 45°
Termination Tee with
Screen
Termination Hood
with Screen
Flexmaster WB1B 26, 35, WB2B 19, 26, 35
B2TA 19, 35, B2TB 19, 35
B2HA 19, 28, 35, B2HB 19, 26, 35
WB2B 45, 60, B2HA 45, 60
B2HB 45, 57, WB2B 80, 105
B2HA 80, 88, 100, 112, 150
Contact
supplier
Contact
supplier
Contact
supplier
Heat-Fab
WB1B 26, 35, WB2B 19, 26, 35
B2TA 19, 35, B2TB 19, 35
B2HA 19, 28, 35, B2HB 19, 26, 35
WB2B 45, 60, B2HA 45, 60
B2HB 45, 57, WB2B 80, 105
B2HA 80, 88, 100, 112, 150
Contact
supplier
Contact
supplier
Contact
supplier
ProTech
WB1B 26, 35, WB2B 19, 26, 35
B2TA 19, 35, B2TB 19, 35
B2HA 19, 28, 35, B2HB 19, 26, 35
WB2B 45, 60, B2HA 45, 60
B2HB 45, 57, WB2B 80, 105
B2HA 80, 88, 100, 112, 150
Contact
supplier
Contact
supplier
Contact
supplier
These tables reflect the parts required if using special venting system for both exhaust vent and air intake pipe system.
If using ABS/PVC/CPVC material for combustion air intake pipe, (refer to page 35 or proper starter adaptor for the system).