24
Wall mounting with bracket set for wall mounting
C D
300
G
F
B
200
A
E
200
220
180
Fig. 16
A
Gravel bed as condensate soakaway
B
Anti-vibration mounts (standard delivery of
bracket)
C
Hydraulic connection lines, indoor/outdoor unit
D
Indoor/outdoor unit Modbus cable and outdoor unit
power cable:
Route the cables so they are not stressed.
E
Connection set, wall mounting (accessories)
F
Openings in the base plate for free drainage of
condensate:
Never seal the openings.
G
Bracket for wall mounting (accessories)
Note
Provide thermal insulation of sufficient thickness on the
pipework to the outdoor air: See table on page 13.
Wall mounting with bracket set for wall mounting
and design casing
C D
300
H
G
B
200
A
E
200
125
180
E
F
300
Fig. 17
A
Gravel bed as condensate soakaway
B
Vibration isolation (standard delivery of the sup-
port)
C
Hydraulic connection lines, indoor/outdoor unit
D
Indoor/outdoor unit Modbus cable and outdoor unit
power cable:
Route the cables free of stress.
E
Connection set, wall mounting (accessories)
F
Design casing wall connection (accessories)
G
Openings in the base plate for free drainage of
condensate:
Never seal the openings.
H
Bracket for wall mounting (accessories)
Note
Provide thermal insulation of sufficient thickness on the
pipework to the outdoor air: See table on page 13.
Installation sequence
Installing the outdoor unit
(cont.)
6150148
Installation