37
A
Frame screw
Installation sequence
1.
Fit the rear panels, see the following
page.
2.
Connect the hydraulic lines, see
page 39.
3.
Fit the side panels, see the following
page.
4.
Fit the front panel.
5.
Fitting the programming unit into the
front panel.
6.
Terminate cables and connect the
programming unit to the control unit,
see page 49.
7.
Fitting the mains isolator; observe
OFF setting.
Installation sequence
Siting the heat pump
(cont.)
5848 449 GB
Installation