26
qE
qR
qT
qZ
qU
8
qW
4
6
2
1
P
P
Required equipment
Pos.
Designation
1
Heat pump
2
Heat pump control unit
4
Primary pump
6
Outside temperature sensor
8
Expansion vessel
Safety assembly, primary circuit
qW
Pressure switch, primary circuit
qE
Frost stat
qR
System separation, groundwater
qT
Flow switch, groundwater
qZ
Filter, groundwater
qU
Circulation pump, groundwater
Preparing for installation
Hydraulic connection, groundwater
5848 449 GB