15
C
Cable entries
On-site strain relief clamps required
(wall clearance ≥ 80 mm).
D
■ When using hydraulic connection
accessories (connection set and
Victaulic flange adaptor set, 2½"
or 3" version):
≥ 1000 mm
■ On-site hydraulic connections:
≥ 600 mm
E
■ Without sound attenuation parts
(side sections):
≥ 855 mm
Foundation
Position the heat pump on a base pre-
pared on site for the purpose of sound
attenuation and even weight distribu-
tion.
Note
In the case of installation in a corner, the
foundation areas or clearances to the
wall increase in line with the minimum
clearances.
150
A
B
C
E
D
A
Concrete B25, iron
B
Floor construction, screed
C
Top edge unfinished floor
D
Impact sound insulation as per
regulations
E
Load-bearing sound insulation
layer, approx. 10 to 20 mm
Preparing for installation
Siting
(cont.)
5848 449 GB
Installation