6
Initial start−up, inspection and maintenance
Further details regarding the individual steps
General information regarding initial start−up, inspection and
maintenance
Please note:
The measures described here relate exclusively to gas fired boilers and
burners.
This comprises only a part of the work prescribed by TRGI’86/96 relating to
the commissioning of a gas fired system.
¨
Safety instructions
Measure the CO value before and after any work on gas appliances, to
prevent any health hazards and to ensure perfect system condition.
Please note:
Record combustion values when the boiler is up to operating temperature
(min. 2minutes operating time) and with the burner hood fitted (for open flue
mode).
Operating and service documents
1.
Complete and detach the
customer registration card:
H
Give the system user this part
for safekeeping.
H
Retain the heating engineer part.
2.
Keep all parts lists, operating and
service instructions in the folder
and hand this over to the system
user.
5692500GB
Summary of Contents for CU3
Page 38: ...38 Burner Component summary 5692 500 GB M A B C D E L K H G F M H F N G O K ...
Page 42: ...42 Parts list Parts list cont 5692 500 GB 201 205 213 1 212 1 202 208 209 210 A B C ...
Page 43: ...43 Parts list Parts list cont 5692 500 GB 206 203 209 204 211 211 211 211 211 211 201 200 ...
Page 45: ...45 Parts list Parts list cont 5692 500 GB 003 003 008 009 005 008 001 002 007 004 006 ...
Page 47: ...47 Appendix Maint service Maint service Maint service Maint service 5692 500 GB ...
Page 49: ...49 Appendix Maint service Maint service Maint service Maint service 5692 500 GB ...
Page 51: ...51 Appendix Maint service Maint service Maint service Maint service 5692 500 GB ...