62
Filling the heating system
!
Please note
Unsuitable fill water increases
the level of deposits and corro-
sion and may lead to boiler dam-
age.
Note the following comments
regarding fill water.
■ Flush the heating system thoroughly
before filling.
■ Only use fill water of potable quality.
■ Ensure the fill water is completely soft-
ened. Water hardness < 0.11 °dH
(0.02 mol/m
3
), e.g. using a small water
softening system for heating water
(see Viessmann Vitoset price list).
■ Antifreeze suitable for heating sys-
tems can be added to the fill water.
The antifreeze manufacturer must ver-
ify its suitability.
A
C
B
1.
Checking the pre-charge pressure of
the diaphragm expansion vessel (on
site).
2.
Close the gas shut-off valve.
3.
Open the shut-off valves
A
and
B
on the heating water side.
4.
Fill the heating system using fill
valve
C
(system pressure 1.0 to
2.5 bar).
5.
Close fill valve
C
.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5618 294 GB
Summary of Contents for C3HA
Page 39: ...39 2 2x 1 Installation sequence Removing the front panel 5618 294 GB Installation ...
Page 42: ...42 1 2 Installation sequence Removing the transport brackets 5618 294 GB ...
Page 151: ...151 Checking and replacing resistors B C A Troubleshooting Repairs cont 5618 294 GB Service ...
Page 181: ...181 Parts lists Control unit assembly cont 5618 294 GB Service ...
Page 183: ...183 Parts lists Miscellaneous assembly cont 5618 294 GB Service ...
Page 191: ...191 5618 294 GB ...