60
Switch on the ON/OFF switch on the
heat pump control unit.
■ The enquiry
"Commissioning
Start?"
appears
automatically
on
first commissioning.
Note
The commissioning assistant can also
be started manually:
For this, hold down the
when
switching on the heat pump control
unit (progress bar appears).
■ When the unit is first commissioned,
the display is in German:
Sprache
Cesky
CZ
Deutsch
DE
Dansk
English
DK
GB
Wählen mit
Ø
ç
■ Manually switching some appliance
components during commissioning
enables the heat pump control unit to
display messages. These do not indi-
cate appliance faults.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5601 598 GB
Summary of Contents for BWT 241.A Series
Page 20: ...20 aCH 11 10 193C SLP N 224 6 9 Installation sequence Siting the heat pump cont 5601 598 GB...
Page 22: ...22 4x 4x 6x 2x 22 19 21 20 Installation sequence Siting the heat pump cont 5601 598 GB...
Page 23: ...23 4x 23 2x 26 25 24 Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Page 27: ...27 C D BB Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Page 71: ...71 Opening programming unit 2 2x 1 3 Troubleshooting Repairs cont 5601 598 GB Service...
Page 123: ...123 5601 598 GB...