29
Connecting the primary/secondary circuits
Connecting the pipe sections or pipe
bends supplied with the connection
set (accessories)
!
Please note
Ensure hydraulic connections are
tight.
With hose outlets, ensure that
their diaphragm grommets are
seated correctly; seal with seal-
ing tape if required (see chapter
"Assembly and sealing faces to
note").
4x
4x
2.
1.
A
B
A
Straight pipe sections supplied
B
Pipe bends from connection set pri-
mary/secondary circuit (accesso-
ries, see separate installation
instructions)
Installation sequence
Hydraulic connections
5601 598 GB
Installation
Summary of Contents for BWT 241.A Series
Page 20: ...20 aCH 11 10 193C SLP N 224 6 9 Installation sequence Siting the heat pump cont 5601 598 GB...
Page 22: ...22 4x 4x 6x 2x 22 19 21 20 Installation sequence Siting the heat pump cont 5601 598 GB...
Page 23: ...23 4x 23 2x 26 25 24 Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Page 27: ...27 C D BB Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Page 71: ...71 Opening programming unit 2 2x 1 3 Troubleshooting Repairs cont 5601 598 GB Service...
Page 123: ...123 5601 598 GB...