34
2x
< 42 V
400/230 V
< 42 V
400/230 V
Overview of the heat pump control unit electrical connections
Note
■ Route 230 V~ cables and LV cables
separately and bundle them tightly
together at the terminals. This ensures
that, in case of failure, for example
when detaching a wire, the wires can-
not drift into the adjacent voltage area.
■ Strip the insulation as close to the ter-
minals as possible.
■ If two components are connected to
the same terminal, press both wires
together into a single wire ferrule.
Installation sequence
Electrical connection
(cont.)
5601 598 GB
Summary of Contents for BWT 241.A Series
Page 20: ...20 aCH 11 10 193C SLP N 224 6 9 Installation sequence Siting the heat pump cont 5601 598 GB...
Page 22: ...22 4x 4x 6x 2x 22 19 21 20 Installation sequence Siting the heat pump cont 5601 598 GB...
Page 23: ...23 4x 23 2x 26 25 24 Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Page 27: ...27 C D BB Installation sequence Siting the heat pump cont 5601 598 GB Installation...
Page 71: ...71 Opening programming unit 2 2x 1 3 Troubleshooting Repairs cont 5601 598 GB Service...
Page 123: ...123 5601 598 GB...