Cleaning the primary store
Note
According to EN 806, a visual inspection
and (if necessary) cleaning must be car-
ried out no later than two years after
commissioning and thereafter as
required.
2.
1.
Drain the primary store.
2.
Remove flange cover
A
.
3.
Disconnect the primary store from the
pipework to prevent contamination
from entering the pipe system.
4.
Remove loose deposits with a high
pressure cleaner.
!
Please note
When cleaning the inside,
only use plastic cleaning uten-
sils.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5773 238 GB
Service
Summary of Contents for B2UA
Page 10: ...10 13 14 15 Preparing for installation Preparing the installation cont 5773 238 GB ...
Page 11: ...11 16 Preparing for installation Preparing the installation cont 5773 238 GB Installation ...
Page 12: ...12 sF 17 19 21 20 18 Preparing for installation Preparing the installation cont 5773 238 GB ...
Page 14: ...14 27 26 25 Preparing for installation Preparing the installation cont 5773 238 GB ...
Page 41: ...41 2x 1 4 2 3 5 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Page 199: ...199 5773 238 GB ...