43
Commissioning steps
Inspection steps
Maintenance steps
Page
•
23. Checking and adjusting the ignition and ionisation
electrodes
........................................................................ 61
•
24. Cleaning the heating surfaces
....................................... 61
•
•
25. Checking the condensate drain and cleaning the
siphon
.............................................................................. 62
•
•
26. Installing the burner
....................................................... 63
•
27. Checking the neutralising system (if installed)
•
28. Checking the anode connection
................................... 64
•
29. Testing the anode earth current with an anode tester
65
•
30. Draining the boiler on the DHW side
............................ 66
•
31. Cleaning the primary store
............................................ 67
•
32. Checking and replacing the magnesium anode (if
required)
.......................................................................... 68
•
33. Re-assembling and filling the primary store
................ 68
•
•
34. Checking the diaphragm expansion vessel and
system pressure
............................................................. 69
•
35. Checking the pre-charge pressure and the DHW
expansion vessel (if installed)
....................................... 70
•
•
•
36. Checking the function of safety valves
•
•
•
37. Checking firm seating of electrical connections
•
•
•
38. Checking all gas equipment for tightness at operating
pressure
........................................................................... 70
•
•
39. Checking the combustion quality
................................. 71
•
•
•
40. Checking the flue system for unrestricted flow and
tightness
•
•
•
41. Checking the external LPG safety valve (if installed)
•
42. Matching the control unit to the heating system
......... 72
•
43. Adjusting the heating curves
........................................ 78
•
44. Connecting the control unit to the LON
....................... 81
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5773 238 GB
Service
Summary of Contents for B2UA
Page 10: ...10 13 14 15 Preparing for installation Preparing the installation cont 5773 238 GB ...
Page 11: ...11 16 Preparing for installation Preparing the installation cont 5773 238 GB Installation ...
Page 12: ...12 sF 17 19 21 20 18 Preparing for installation Preparing the installation cont 5773 238 GB ...
Page 14: ...14 27 26 25 Preparing for installation Preparing the installation cont 5773 238 GB ...
Page 41: ...41 2x 1 4 2 3 5 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Page 199: ...199 5773 238 GB ...