47
Filling the cylinder on the DHW side
1.
Lever on valve
B
must be in the
"left" position.
2.
Open on-site DHW supply and a
DHW draw-off point.
3.
Once air stops coming out of the
DHW draw-off point, the DHW cylin-
der is completely filled.
Changing the language
At the commissioning stage, the display
is in German (factory setting).
Extended menu:
1.
å
2.
"Einstellungen"
3.
"Sprache"
4. Select the required language with
/ .
Sprache
Dansk
Cesky
Bulgarski
Deutsch
Wählen mit
ê
ê
ç
DE
BG
CZ
DK
ê
ê
(
Setting the time and date
The time and date need to be reset dur-
ing commissioning or after a prolonged
time out of use.
Extended menu:
1.
å
2.
"Settings"
3.
"Time / Date"
4. Set current time and date.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5773 238 GB
Service
Summary of Contents for B2UA
Page 10: ...10 13 14 15 Preparing for installation Preparing the installation cont 5773 238 GB ...
Page 11: ...11 16 Preparing for installation Preparing the installation cont 5773 238 GB Installation ...
Page 12: ...12 sF 17 19 21 20 18 Preparing for installation Preparing the installation cont 5773 238 GB ...
Page 14: ...14 27 26 25 Preparing for installation Preparing the installation cont 5773 238 GB ...
Page 41: ...41 2x 1 4 2 3 5 Installation sequence Fitting the front panels 5773 238 GB Installation ...
Page 199: ...199 5773 238 GB ...