36
Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Commissioning the system with the commissioning assistant
.................................... 37
•
•
................................................................................................. 41
•
3. Topping up the heating water
........................................................................................... 43
•
•
•
4. Checking all connections on the heating water and DHW sides for leaks
•
............................................................................................... 43
•
6. Naming the heating circuits
.............................................................................................. 44
•
7. Entering contact details of heating contractor
................................................................ 44
•
•
9. Converting the gas type for operation with LPG
............................................................. 44
•
•
•
•
11. Moving the programming unit to the maintenance position
.......................................... 46
•
•
•
12. Checking the static pressure and supply pressure
........................................................ 46
•
13. Function sequence and possible faults
........................................................................... 48
•
14. Setting the max. heating output
........................................................................................ 49
•
15. Adjusting the pump rate of the integral circulation pump
............................................. 50
•
•
17. Leak test on balanced flue system (annular gap check)
................................................ 52
•
•
•
19. Checking the burner gasket and burner gauze assembly
.............................................. 54
•
•
20. Checking and adjusting the ignition and ionisation electrodes
.................................... 55
•
•
21. Checking the back draught safety devices
...................................................................... 55
•
22. Cleaning the heating surfaces
.......................................................................................... 56
•
•
23. Checking the condensate drain and cleaning the trap
................................................... 56
•
•
•
•
25. Checking the neutralising system (if installed)
•
26. Checking the flow limiter (only for gas condensing combi boiler)
............................... 59
•
•
•
27. Checking the expansion vessel and system pressure
................................................... 59
•
•
•
28. Checking the safety valve function
•
•
•
29. Checking the electrical connections for firm seating
•
•
•
30. Checking all gas equipment for leaks at operating pressure
........................................ 60
•
•
•
•
•
32. Checking the combustion quality
..................................................................................... 60
•
•
•
33. Checking the flue system for unrestricted flow and leaks
•
•
•
34. Checking the external LPG safety valve (if installed)
•
35. Matching the control unit to the heating system
............................................................ 62
•
•
37. Calling up and resetting the maintenance display
.......................................................... 62
•
38. Instructing the system user
.............................................................................................. 63
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5593201
Summary of Contents for B2HF
Page 33: ...33 2 2x 1 Fig 26 Installation sequence Closing the wiring chamber 5593201 Installation ...
Page 111: ...111 1 2 4 3 6 5 Fig 56 Troubleshooting Repairs cont 5593201 Diagnosis ...
Page 134: ...134 WiFi router 31 Wiring diagram 121 Keyword index Keyword index cont 5593201 ...
Page 135: ...135 5593201 ...