116
Note
During screed drying, DHW heating is not available.
Observe EN 1264. The report to be provided by the
heating contractor must contain the following details
regarding heat-up:
■
Heat-up data with the relevant set flow temperatures
■
Max. flow temperature achieved.
■
Operating state and outside temperature at handover
Different temperature profiles can be set via parameter
897.0.
Note
Temperature profile 6 ends after 21 days.
The function continues after a power failure or after the
control unit has been switched off. When screed drying
has completed or been manually switched off, the sys-
tem is regulated in accordance with the selected
parameters.
Parameter 897.0 "Screed drying":
Temperature profile 1 (EN 1264-4)
Flow temperature
°C
1
5
10
15
20
25
30
Days
50
40
30
20
10
Fig. 62
Temperature profile 2 (ZV parquet and flooring technology)
Flow temperature
°C
Days
50
40
30
20
10
1
5
10
15
20
25
30
Fig. 63
Temperature profile 3
Flow temperature
°C
Days
50
40
30
20
10
1
5
10
15
20
25
30
Fig. 64
Temperature profile 4
Flow temperature
°C
Days
50
40
30
20
10
1
5
10
15
20
25
30
Fig. 65
Function description
Appliance functions
(cont.)
5593201
Functions
Summary of Contents for B2HF
Page 33: ...33 2 2x 1 Fig 26 Installation sequence Closing the wiring chamber 5593201 Installation ...
Page 111: ...111 1 2 4 3 6 5 Fig 56 Troubleshooting Repairs cont 5593201 Diagnosis ...
Page 134: ...134 WiFi router 31 Wiring diagram 121 Keyword index Keyword index cont 5593201 ...
Page 135: ...135 5593201 ...