43
5784 568 - 13
Vitodens 100-W, B1HA/B1KA 26 to 125 Combi Installation/Service
Necessary Tools
Start-up, Inspection and Maintenance
Special items
Approved leak detection fluid for natural gas
Pipe joint sealant
Garden hose for bleeding boiler heat exchanger
and pressure testing
Cleaning supplies
Plastic hand brush
Rags
Testing/analysis equipment
(use only calibrated equipment)
Multimeter to measure 0 - 12A, 120V and
resistances
Flue gas analyzer to measure % CO
2
or O
2
(i.e. Bacharach fluid samplers or suitable electronic
flue gas analyzer)
Manometer to measure gas pressure 0 to 11 “w.c.
(accurately) and up to 28 “w.c. gas pressure (or a non-
electric Magnehelic® manometer may also be utilized)
Stack thermometer 0 to 500°F (0 to 260°C)
Carbon monoxide measuring equipment 0 to 400 ppm.
Control and display elements
The control unit is preset at the factory for standard
operation. Your heating system is ready for use. The
factory presets may be individually adjusted to suit your
specific requirements.
Legend
A
Pressure gauge
B
LCD display unit
C
Power switch ON/OFF
Overview of Controls and Indicators
Legend
A
Display value or “
F
” (fault)
B
Temperature in °F/°C (in conjunction with
the display value)
C
Heating mode
D
DHW heating
E
Display value or fault code
F
Fault indicator
G
Burner fault reset
H
Temperature in °F/°C (in conjunction with
the display value)
I
On-screen buttons
J
Commissioning setting active (contractors only)
K
DHW comfort function active (only for B1KA)
L
Current burner output (each bar = 20% *)
M
DHW comfort function not active (only for B1KA)
N
Service setting active (contractors only)
O
Burner in operation
IMPORTANT
In Canada all electrical wiring is to be done in accordance
with the latest edition of CSA C22.1 Part 1 and/or local
codes. In the U.S. use the National Electrical Code ANSI/
NFPA 70. The heating contractor must also comply with
both the Standard for Controls and Safety Devices for
Automatically Fired Boilers, ANSI, ASME CSD-1.
A power module is supplied with the Vitodens 100-W
boiler, which requires a 120VAC power supply, for
simplified installation the boiler is equipped with a 3-prong
plug for use with a standard 120VAC wall receptacle.
The voltage at connector X3 must be 120V (see wiring
diagram).
Check Power Supply Connection