3.5.2 Mounting the control box
3.5.2.1 Mounting the control box – Hefaistos P1 T (see Fig. no. 10)
1.
Dismount the upper part of the control box (3) by means of 2 screws M5 x 12 and serrated lock washers
5,3 – see detail B. Thread the capillaries of the control box thermostats through the opening in the upper
part of the shell and by means of 2 pc screws M5 x 25 and serrated lock washers 5,3 screw the control
box to the upper front part of the shell (4) – see detail A.
2.
Put the upper part of the shell (4) on the side parts of the shell (1, 2):
- Insert the flue gas thermostat capillary into the smoke adaptor basin;
- screw the manometer capillary into the check valve and insert the capillaries of thermometer and
thermostats into the basin in the water space of the feed hopper and secure by the spring of
capillaries.
3.
In the upper part of the boiler shell (5) break out a perforated opening either on the right or left side,
depending on the need. Install the bushing ICOTEK.
4.
Carry out the wiring (see chap. 4.8).
It is necessary to ensure that the wiring and capillaries do not directly touch the feed hopper.
5.
Insert the front upper part of shell (4) and upper part of the shell (5) on the side parts of the shell (1, 2).
6.
Screw the rear part of the shell (6) to the upper (5) and side parts of the shell (1, 2) by means of
11 pc screws C 4,8 x13 and serrated lock washers 5,3 – see detail B.
3.5.2.2 Mounting the control box – Hefaistos P1 E (see Fig. no. 10)
1.
Install the limit switch see chap. 3.5.3.
2.
Dismount the upper part of the control box (3) by means of 2 screws M5 x 12 and serrated lock washers
5,3 – see detail B. Thread the capillaries of the control box thermostats through the opening in the upper
part of the shell and by means of 2 pc screws M5 x 25 and serrated lock washers 5,3 screw the control
box to the upper front part of the shell (4)- see detail A.
3.
Put the upper part of the shell (4) on the side parts of the shell (1, 2):
- Insert the flue gas thermostat capillary into the smoke adaptor basin;
- Screw the manometer capillary into the check valve and insert the capillary of safety thermostat and
the sensor of boiler water output temeperature (ÚT) into the basin in water space of the feed hopper
and secure by the spring of capillaries.
4.
In the upper part of the boiler shell (5) break out a perforated opening either on the right or left side,
depending on the need.Install the bushing ICOTEK.
5.
Carry out the wiring (see chap.4.8). Put the sensor of flue gases temperature on the flue gas ducting
and secure by means of a self-drilling screw in the distance 3 x D (diameter of the the flue gas ducting)
from the shell of ventilator.
It is necessary to ensure that the wiring and capillaries do not directly touch the feed hopper.
6.
Insert the front upper part of shell (4) and upper part of the shell (5) on the side parts of the shell (1, 2).
7.
Screw the rear part of the shell (6) to the upper (5) and side parts of the shell (1, 2) by means of 11 pc
screws C 4,8 x13. and serrated lock washers 5,3 – see detail B.
Summary of Contents for Hercules P 1
Page 1: ...Hercules U26 Návod k obsluze Hefaistos P 1 MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Page 44: ...44 ...
Page 46: ...46 ...
Page 47: ...47 ...
Page 48: ...48 Update Date 42 2012 GB ...