32
5.
Operating manual
WOOD
Dry split wood logs from 80 to 150 mm.
Length according to Table 3
Tab. No. 3
Length of logs
po
č
et
č
lánk
ů
3
4
5
6
7
L mm]
330
470
610
750
890
Calorific value 15 – 17 MJ /kg
Moisture
12 – 20 %
Manufacturer’s warning: Boiler output and its functionality are guaranteed for moisture up to 20%.
When burning the wet wood the boiler does not work in the gasification regime, its output is reduced and
emissions are worse and there occurs the flue gases condensation in the boiler. Consequently the boiler and
chimney service life are shorter.
Fig.no. 23
Location of fuel in the boiler
5.1
Operation of boiler by user
5.1.1 Operation of boiler by user – Hefaistos P1 T
Making a fire (firing)
1. Check the water quantity in the heating system indicated on the thermo-manometer
2. Open the stop valves between boiler and heating system
3. Clean the boiler drum and smoke pathways see chapter 6
4. The flue gases ventilator must not be working
5. Open the throttle valve (choking valve)
6. Insert kindling through the stoking door – dry, smaller wood chips upright on the duct (it is necessary to
pay attention to flue gases flow continuity), then paper and bigger wood chips
7. Ignite the kindling in the feed hopper
8. Close the stoking door
Summary of Contents for Hercules P 1
Page 1: ...Hercules U26 Návod k obsluze Hefaistos P 1 MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Page 44: ...44 ...
Page 46: ...46 ...
Page 47: ...47 ...
Page 48: ...48 Update Date 42 2012 GB ...