9
3.
Installation instructions
3.1
Boiler construction
The sectional boiler drum made of grey cast iron according to EN 1561, quality 150 is the main part of the
boiler.
Pressure parts of boiler correspond to strength requirements according to EN 303 - 5 – Heating boilers –
Part 5: Heating boilers for solid fuels with manual or automatic stoking and nominal heat output of up to
300 kW – Terminology, requirements, testing and marking.
The boiler drum is made of sections by means of pressed boiler inserts (nipples)
Φ
56 mm and rubber o-
rings and secured by anchor bolts. The sections create combustion space, ash pan and water spaces and
also the convection part. The feed shaft consists of feed hopper, which is made of sheet metal intended for
combustion processes. The upper part of the feed hopper is water-cooled. The heating water inlet and outlet
are situated at the rear part of the boiler.
At the rear section of the boiler there is mounted the smoke adaptor with air exchanger and exhaust
ventilator. The return water connection is situated in the upper part of boiler drum. The heating water
connection is situated in the upper part of the feed hopper. Water inlet and outlet can be connected by
means of threaded pipes. The stoking door is mounted to the feed hopper and the ash pan door to the front
boiler section. The ash pan and stoking door are made with the possibility of left-right opening (see Fig.
No. 5).The whole boiler drum is insulated by using the harmless mineral insulation, which reduces the losses
caused by the heat transfer to the ambient. The boiler shell is coated with high-quality comaxit spray.
Fig.no. 5
Left-right opening
Summary of Contents for Hercules P 1
Page 1: ...Hercules U26 Návod k obsluze Hefaistos P 1 MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Page 44: ...44 ...
Page 46: ...46 ...
Page 47: ...47 ...
Page 48: ...48 Update Date 42 2012 GB ...