![background image](http://html.mh-extra.com/html/viadrus/hercules-p-1/hercules-p-1_manual-operation-and-installation_1011356017.webp)
17
1.
filling and drain valve G 1/2“
2.
shell with ventilator
3.
return water input (with distribution pipe)
4.
boiler plug 1/2“
5.
sleeve 1 1/2“
6.
heating water output
7.
boiler plug 1/2“
8.
two-way safety valve DBV 1 – 02
9.
interconnecting hose 3/4“
10. air-release valve 1/2“
11. pipe-output
12. long bend 1 1/2“
13. T-joint 1 1/2“
14. interconnecting hose 1 1/2“
15. radiator plug 1 1/2“
16. sealing 1 1/2“
Fig.no. 9b)
Installing the boiler drum – Hefaistos P1 E
Summary of Contents for Hercules P 1
Page 1: ...Hercules U26 Návod k obsluze Hefaistos P 1 MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Page 44: ...44 ...
Page 46: ...46 ...
Page 47: ...47 ...
Page 48: ...48 Update Date 42 2012 GB ...