4
7.
Ecological operation that meets the requirements for the granting the trademark ESV (Environmentally
friendly product)
2.3
Technical data of boiler
Tab. No. 1 Dimensions, technical parameters – fuel: wood
Number of sections
pcs
3
4
5
6
7
Rated thermal output
kW
30
40
49,5
75
100
Fuel consumption at rated thermal output
kg.h
-1
8,0
10,66
13,32
19,99
26,65
Fuel efficiency
MJ.kg
-1
15,01
15,01
15,01
15,01
15,01
Feed hopper volume
l
99
138
177
216
255
Burning time at rated output
hour
3
3
3
3
3
Flue gases temperature at outlet
°C
140 – 200
Flue gases mass flow at rated thermal output
g.sec
-1
16,33
21,77
27,22
40,83
54,43
Efficiency
%
83 – 89
Boiler class according to EN 303 – 5
-
3
3
3
3
3
Water volume
l
52,9
68,9
85
99,1
117,2
Weight
kg
584
702
820
959
1077
Combustion chamber depth
mm
354
495
636
777
918
Diameter of smoke throat
mm
160
200
Boiler dimensions: – height x width
mm
1541 x 833
– depth
mm
1167
1308
1449
1794
1935
Filling opening dimensions
mm
505 x 256
Maximum working water overpressure
kPa (bar)
400 (4)
Minimum working water overpressure
kPa (bar)
50 (0,5)
Testing water overpressure
kPa (bar)
800 (8)
Boiler hydraulic losses
-
see Fig. no. 1
Input water minimum temperature
°C
60
Water temperature control range
°C
60 – 85
Noise level
dB
Does not exceed the level of 65 dB (A)
Required draught
mbar
0,25 – 0,35
Boiler connections – heating water
“
6/4
– return water
“
6/4
Cooling water temperature for equipment to remove excess
heat
°C
5 – 20
Cooling water overpressure for equipment to remove excess
heat
kPa (bar)
200 – 600 (2 - 6)
Connecting voltage
1/N/PE 230V AC 50 Hz TN - S
Electric input
W
180
800
Electric coverage
IP 40
D ependenc e of pres s ure los s on rate of flow
0
2000
4000
6000
8000
10000
12000
14000
0
0,2
0,4
0,6
0,8
1
1,2
1,4
1,6
1,8
Qz (10
-3
m
3
.s
-1
)
p
z
(
P
a
)
3 s ec tions
4 s ec tions
5 s ec tions
6 s ec tions
7 s ec tions
Fig. no. 1
Hydraulic losses of boiler drum
Summary of Contents for Hercules P 1
Page 1: ...Hercules U26 Návod k obsluze Hefaistos P 1 MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Page 44: ...44 ...
Page 46: ...46 ...
Page 47: ...47 ...
Page 48: ...48 Update Date 42 2012 GB ...