EUROBLOC
GENERAL OVERHAUL INSTRUCTIONS
34/69
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
09/2016
8.6
Rope pressure roller
The operational testing of the rope pressure roller must be done before the hoist is lowered to the floor level.
8.6.1 Construction of rope pressure roller for hoist frame size: VT3
1. Pressure roller
2. Intermediate shaft
Replace the pressure roller if:
Inspection method:
the pressure roller does not work properly.
Check that the roller turns freely. Verify that lifting the
roller by 1/3 of the diameter actually trips the limit
switch.
Inspect for worn or broken roller or shaft.
there are worn out or damaged parts in the pressure
roller.
TO ORDER: a complete pressure roller or pressure roller parts: See Spare Part Catalogue