EUROBLOC
GENERAL OVERHAUL INSTRUCTIONS
12/69
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
09/2016
CAUTION
Never attempt to operate a control, switch, valve, or other device when it is
locked out or tagged out.
Items which are normally included in the documented lockout-tagout policy:
Communication requirements: who to inform before using lockout - tagout.
When the use of lockout - tagout is permitted.
Identification of each of the switches, controls, valves, and other energy isolating devices present at the site.
The role of each device should also be explained.
The lockout - tagout sequences to be followed before, during and after maintenance.
Safety and operational considerations regarding other products on the same runway or on adjacent runways.