EUROBLOC
GENERAL OVERHAUL INSTRUCTIONS
20/69
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
09/2016
5.3
Content and cost estimate
Based on the information collected at earlier phases, it can be determined whether the General Overhaul service is
a reasonable action, or in general, possible for the hoist, or if the hoist must be replaced with a new one. The GO
package has a fixed price for spare parts. In addition, the labor costs, equipment rentals, and so on, are evaluated
locally and included into the overall cost estimate.
5.4
Performing General Overhaul
WARNING
When the Safe Working Period (SWP) of the hoist has decreased to zero or is
counting in the negative, the hoist may only be used after a GO service has
been conducted. Any usage of a defective hoist can result in serious damage,
injury, or death.
CAUTION
When performing General Overhaul, the construction of the hoist may not be
changed or the supporting structures repaired without permission from the
manufacturer. If there are any deformations, cracks or corrosion in the
supporting structures of the hoist, the parts have to be replaced or repaired
according to the instructions given by the manufacturer.
Only authorized service personnel or an experienced service man that is authorized by the manufacturer or
manufacturer representative may conduct a General Overhaul service. The components that have an impact on the
product lifetime are inspected and the critical components are replaced.
Instructions on assembling and disassembling components that have to be checked and replaced are shown in
“Service Manual for Hoist”.
Document “Spare Part Catalogue For Hoist” includes the lists of the spare parts and item codes.
5.5
Commissioning inspection
Inspect the operation of the hoist in the end of the General Overhaul service. For more information, see chapter
“Commissioning”.