39
20901559_EN_RE_RZ_V7_230523
Installation and connection
Mains connection
The vacuum pump is delivered ready for use with the appropriate
power plug.
>
Use the power plug which fits your power supply.
>
Do not use multiple sockets connected in series as power
connection.
4.4
4.4
Oil level check
Oil level check
>
The vacuum pump is delivered with oil filling. Check the oil
level of the vacuum pump through the sight glass.
max.
min.
>
The oil level has to be
between the marks "min."
and "max." on the rating
plate.
>
Adjust the oil level, if neces‑
sary,
see chapter:
.
IMPORTANT!
Check oil level
Summary of Contents for RE 2.5
Page 24: ...24 20901559_EN_RE_RZ_V7_230523 Introduction ...
Page 40: ...40 20901559_EN_RE_RZ_V7_230523 Installation and connection ...
Page 48: ...48 20901559_EN_RE_RZ_V7_230523 Installation and connection ...
Page 73: ...73 20901559_EN_RE_RZ_V7_230523 Appendix 8 8 8 8 CU Certificate CU Certificate CU Certificate ...
Page 76: ...76 20901559_EN_RE_RZ_V7_230523 ...
Page 77: ...77 20901559_EN_RE_RZ_V7_230523 ...
Page 78: ...78 20901559_EN_RE_RZ_V7_230523 ...