4.- PREPARATIONS BEFORE TO USE
- 24 -
- Safety check.
The equipment to be measured should be checked to ensure that it is duly
isolated from the external connection lines and completely discharged.
- Connection of high voltage cables to UM2B.
The high voltage cables should first be connected to the unit (8). Next,
choose measurement configuration to perform test. The phases of each
winding (high/low) will be put on short circuit. The phases may be
interconnected by means of bare copper wire if the distances are short and
there is no risk of short-circuiting to ground; otherwise, a proper insulating
cable should be used. Finally, connect positive / negative terminal according
to software indications.
Never remove high voltage connectors during test.
Figure 4-2: Configuration of the test.
V max.:
2000 V dc
I max.:
5 mA
Installation:
CAT II
For properly measuring, the cables must be completely stretched until the
measurement point without creases, or anyway, that these have a radius
not under 200 mm.
Summary of Contents for UM2B
Page 2: ......
Page 67: ...5 SOFTWARE DESCRIPTION 65 Figure 5 46 a First page of the report Recovery Voltage ...
Page 68: ...5 SOFTWARE DESCRIPTION 66 Figure 5 47 a Second page of report Recovery Voltage ...
Page 69: ...5 SOFTWARE DESCRIPTION 67 Figure 5 48 Third page of report Recovery Voltage ...
Page 70: ...5 SOFTWARE DESCRIPTION 68 Figure 5 46 b First page of the report Insulation Resistance ...
Page 71: ...5 SOFTWARE DESCRIPTION 69 Figure 5 47 b Second page of the report Insulation Resistance ...
Page 87: ...8 TECHNICAL SUPPORT 85 Description of fault Materials returned on of of the year Table 8 1 ...
Page 95: ...APPENDIX B CONTROL SOFTWARE 93 APPENDIX A CE CONFORMITY DECLARATION ...