
30A135
3) Use the “L” shaped brush to push the sediment through the drain valve to keep the drain clear. Hose off the heat
exchanger and vat walls until all sediment and debris has been fl ushed through the drain into the fi lter tub.
4) Turn the
RIGHT HAND
Topside Shortening Return Lever
1⁄4 turn counter clock wise
; then
CAREFULLY
remove the Wash Down Hose
MALE
In-Line Plug from the
TOPSIDE FEMALE SOCKET
by depressing
the Topside Socket Release Knob.
5)
Hang the Wash Down Hose in an up-right position so shortening can drain into a metal container; then proceed
to paragraph B 1 page 42.
b. Fryer
WITH
an Automatic Vat Cleaner (AVC).
1) With the Drain Valve in the
OPEN
position,
CAREFULLY
place the AVC (Spray Blaster) on the fryer’s
TOPSIDE
HANGER BRACKET
and
SECURELY
connect the
MALE
In-Line Plug on the AVC to the
TOPSIDE FEMALE
SOCKET
.
2) Turn the
RIGHT HAND
Topside Shortening Return Lever
1⁄4 turn counter clock wise
to allow shortening in the
fi lter tub to be discharged into the vat through the four (4) nozzles in the bottom of the spray blaster, fl ushing
sediment and debris through the drain valve. When all sediment and debris has been fl ushed from the vat, turn the
Topside Shortening Return Lever
1⁄4 turn clock wise
, remove the male in-line plug on the Spray Blaster from the
Topside Female Socket by depressing the Topside Release Knob.
3. CAREFULLY
remove the
HOT
Automatic Vat Cleaner from the hanger bracket, and
THOROUGHLY
clean it in a
3 compartment sink.
4. Proceed to paragraph B 1 page 42.
Page 41 of 61
������� ������
������� ����
������� ������
������ �������
������� ������
������ � ���������
������ ������
Summary of Contents for PAR-3-HE
Page 5: ...30A135 GENERAL INFORMATION Page 1 of 61...
Page 11: ...30A135 PRE INSTALLATION Page 7 of 61...
Page 13: ...30A135 RECEIVING INSTALLING Page 9 of 61...
Page 18: ...30A135 INITIAL START UP Page 14 of 61...
Page 22: ...30A135 OPERATING INSTRUCTIONS Page 18 of 61...
Page 24: ...30A135 MAINTENANCE ELECTRONIC THERMOSTAT CALIBRATION Page 20 of 61...
Page 26: ...30A135 PREVENTITIVE MAINTENANCE TROUBLESHOOTING Page 22 of 61...
Page 29: ...30A135 RECOMMENDED SPARE PARTS Page 25 of 61...
Page 31: ...30A135 CLEANING Page 27 of 62...
Page 36: ...30A135 FRYER OPERATION Page 32 of 61...
Page 41: ...30A135 FILTER TUB ASSEMBLY INSTALLATION Page 37 of 61...
Page 43: ...30A135 FILTERING POLISHING SHORTENING Page 39 of 61...
Page 48: ...30A135 SHORTENING DISPOSAL BOIL OUT INSTALLATION Page 44 of 61...
Page 52: ...30A135 TECHNICAL ASSISTANCE ORDERING INFORMATION PARTS IDENTIFICATION Page 48 of 61...
Page 54: ...30A135 ULTRAFRYER MODEL PAR 3 HE GAS FRYER FRONT VIEW Page 50 of 61 18 PAR 3 HE...
Page 61: ...30A135 WIRING DIAGRAMS Page 57 of 61...
Page 63: ...30A135 PAR 3 HE GAS FRYER W COMPUTER Page 59 of 61...
Page 64: ...30A135 PAR 3 HE GAS FRYER W COMPUTER BASKET LIFT Page 61 of 62...
Page 65: ...30A135 THIS PAGE INTENTIONALLY LEFT BLANK Page 61 of 61...