
30A135
OPERATING INSTRUCTIONS:
The Model PAR-3-HE gas fryer is equipped with a shortening filter system which is to be operated
and cleaned according to the operating section of this manual.
A GENERAL:
1.
SHORTENING:
Use a high quality shortening to achieve a consistent quality product as well as a long term savings.
2.
SHORTENING TEMPERATURE:
Most products should be cooked with a shortening temperature about 350°F (177ºC);
however, each product should be cooked at the
LOWEST
temperature that produces a high quality product while obtaining
maximum usage of the shortening.
3.
SALTING:
Products should not be salted over the fryer vessel as salt quickly deteriorates the shortening and flavors other
products cooked in the same shortening.
4.
POWER FAILURES:
The Model PAR-3-HE fryer cannot be operated during power failures.
DO NOT
attempt to manually
operate the fryer.
5.
PUMP MOTOR:
The filter pump motor is protected by a motor thermal overload switch.
CAUTION: ENSURE THE WASH DOWN HOSE IS NOT CONNECTED TO A FRYER PRIOR TO RESETTING A THERMAL
OVERLOAD SWITCH.
B FILTERING SHORTENING:
The fryer must be filtered al least twice a day (once after the lunch rush and again after the dinner
rush). Place the recommended amount of filter agent in the shortening as prescribed by the chemical supplier and follow instruc-
tions for filtering shortening provided in the operating section, page 40 of this manual.
C LEVELING SHORTENING:
After filtering, the shortening level must be checked and fresh shortening added when necessary.
1. The shortening in the vat should reach to the middle line of the
“E”
in the word LEVEL of the shortening level mark on the rear
wall of the fryer.
2. If shortening is needed, use the filter scraper to cut off a small block of solid shortening.
3. Place the small block of shortening into a fry basket, lower the basket into the shortening; then turn the basket to allow the
block to float freely.
4. Repeat the above steps until the shortening in the vat is at the proper level.
D BOILING OUT FRYER:
The fryer should be
BOILED OUT
every
7 DAYS
to remove carbon buildup and other encrusted materi-
als. Add the amount of boil out compound to the fryer as prescribed in the cleaning manual provided by the chemical supplier
and follow instructions for boiling out a fryer in the operating section of this manual.
E CLOSING / SHUTDOWN INSTRUCTIONS:
1. CLOSING:
When closing at night; filter the shortening in the fryer,
THOROUGHLY
drain all filter lines and cover the fryer
vessel. Turn the
ON/OFF
Switch on the fryer
OFF
and turn the Manual Gas Valve
OFF
.
2. SHUTDOWN OR PROLONGED POWER FAILURE:
a. Shutdown: Perform the following whenever a fryer is being shutdown for an extended period of time:
1) Drain and discard the shortening.
2)
THOROUGHLY
clean the fryer vat.
3) Turn the ON/OFF Switch to the
OFF
position, disconnect the 120-volt power cord and turn applicable Circuit
Breakers
OFF.
4) Turn the Manual Gas Valve
OFF.
b. Prolonged power failure: The Model PAR-3-HE fryer cannot be operated during power failures.
DO NOT
attempt to
bypass safety controls and manually start the fryer.
Page 19 of 61
Summary of Contents for PAR-3-HE
Page 5: ...30A135 GENERAL INFORMATION Page 1 of 61...
Page 11: ...30A135 PRE INSTALLATION Page 7 of 61...
Page 13: ...30A135 RECEIVING INSTALLING Page 9 of 61...
Page 18: ...30A135 INITIAL START UP Page 14 of 61...
Page 22: ...30A135 OPERATING INSTRUCTIONS Page 18 of 61...
Page 24: ...30A135 MAINTENANCE ELECTRONIC THERMOSTAT CALIBRATION Page 20 of 61...
Page 26: ...30A135 PREVENTITIVE MAINTENANCE TROUBLESHOOTING Page 22 of 61...
Page 29: ...30A135 RECOMMENDED SPARE PARTS Page 25 of 61...
Page 31: ...30A135 CLEANING Page 27 of 62...
Page 36: ...30A135 FRYER OPERATION Page 32 of 61...
Page 41: ...30A135 FILTER TUB ASSEMBLY INSTALLATION Page 37 of 61...
Page 43: ...30A135 FILTERING POLISHING SHORTENING Page 39 of 61...
Page 48: ...30A135 SHORTENING DISPOSAL BOIL OUT INSTALLATION Page 44 of 61...
Page 52: ...30A135 TECHNICAL ASSISTANCE ORDERING INFORMATION PARTS IDENTIFICATION Page 48 of 61...
Page 54: ...30A135 ULTRAFRYER MODEL PAR 3 HE GAS FRYER FRONT VIEW Page 50 of 61 18 PAR 3 HE...
Page 61: ...30A135 WIRING DIAGRAMS Page 57 of 61...
Page 63: ...30A135 PAR 3 HE GAS FRYER W COMPUTER Page 59 of 61...
Page 64: ...30A135 PAR 3 HE GAS FRYER W COMPUTER BASKET LIFT Page 61 of 62...
Page 65: ...30A135 THIS PAGE INTENTIONALLY LEFT BLANK Page 61 of 61...