30A135
b.
TO TEST OPERATE
a Ultrafryer Gas Fryer equipped with an Ultrastat 11 Cooking Computer:
1) Ensure the fryer’s Toggle ON/OFF Switch is in the
OFF
position.
2) Fill the fryer vat with hot or cold water to the middle of the
“E”
in the word
LEVEL
of the shortening level mark on
the rear of the vat.
3) Turn the MANUAL gas valve to the
OFF
position and wait
FIVE
(5)
minutes for any accumulated gas to disperse.
4)
ENSURE
the
MAIN
gas shut-off valve is in the
ON
position, and that the Vent Hood
EXHAUST FAN
is
ON
.
5) Turn the MANUAL GAS VALVE to the
ON
position.
6) Perform the following steps, in the order listed:
STEP
ACTION
RESPONSE
1
ENSURE
the drain valve is in the closed posi-
tion and that water is at the proper level; then
turn the Toggle ON/OFF switch to the
ON
position and turn the Ultrastat 11 Cooking
Computer
ON
by depressing the
ON/OFF
key.
A. The
AMBER
power lamp beside the fryer Toggle
ON/OFF switch will
LIGHT.
B. CY P will appear in the Ultrastat 11 Computer display
to indicate it is in the
PURGE MELT MODE.
C. The Computer will begin cycling the gas burner
ON
and
OFF
.
CAUTION: PRIOR TO PROCEEDING TO STEP 2, VISUALLY CHECK THAT THE HEAT EXCHANGERS TUBES ARE
COVERED BY AT LEAST 2” (51 mm) OF WATER.
2
When the water begins to
BOIL,
depress the
EXIT MELT
key.
HEAt
will appear in the computer display to
indicate it is in the
FULL ON
mode.
3
Depress the
TEMP
key
ONCE.
The
ACTUAL
water temperature will be shown
in the computer display
4
Turn the Ultrastat 11
OFF
by depressing and
holding the
ON/OFF
key for
3 SECONDS,
then turn the fryer
TOGGLE ON/OFF
switch
to the
OFF
position
The
AMBER POWER
lamp beside the fryer
TOGGLE ON/OFF
switch will turn
OFF.
5
After the water in the vat and metal surfaces of
the fryer has
COOLED
, drain the water into a
floor drain.
c. TO TEST OPERATE
a Ultrafryer Gas Fryer equipped with an Ultrastat 21 Cooking Computer, use the procedures con-
tained in the Ultrastat 21 Gas Fryer Computer Operation Instructions PN 30A009, provided with the fryer.
d. TO TEST OPERATE
a Ultrafryer Gas Fryer equipped with an Ultrastat 25 Cooking Computer, use the procedures con-
tained in the Ultrastat 25 Gas Fryer Computer Operation Instructions PN 30A051, provided with the fryer.
G.
INITIAL CLEANING -
New MODEL PAR-3-HE gas fryers are wiped clean at the factory to remove any visible signs of dirt,
oil, grease, etc., remaining from the manufacturing process. Each fryer and filter system should be
THOROUGHLY
washed
with
HOT
sanitizer solution to remove film residues, installation dust or debris and then wiped dry prior to placing the fryer
in operation.
Vat Shortening
Return Lever
(shown Closed)
Topside Shortening
Return Lever
(shown Open)
Drain Valve
Page 17 of 61
Summary of Contents for PAR-3-HE
Page 5: ...30A135 GENERAL INFORMATION Page 1 of 61...
Page 11: ...30A135 PRE INSTALLATION Page 7 of 61...
Page 13: ...30A135 RECEIVING INSTALLING Page 9 of 61...
Page 18: ...30A135 INITIAL START UP Page 14 of 61...
Page 22: ...30A135 OPERATING INSTRUCTIONS Page 18 of 61...
Page 24: ...30A135 MAINTENANCE ELECTRONIC THERMOSTAT CALIBRATION Page 20 of 61...
Page 26: ...30A135 PREVENTITIVE MAINTENANCE TROUBLESHOOTING Page 22 of 61...
Page 29: ...30A135 RECOMMENDED SPARE PARTS Page 25 of 61...
Page 31: ...30A135 CLEANING Page 27 of 62...
Page 36: ...30A135 FRYER OPERATION Page 32 of 61...
Page 41: ...30A135 FILTER TUB ASSEMBLY INSTALLATION Page 37 of 61...
Page 43: ...30A135 FILTERING POLISHING SHORTENING Page 39 of 61...
Page 48: ...30A135 SHORTENING DISPOSAL BOIL OUT INSTALLATION Page 44 of 61...
Page 52: ...30A135 TECHNICAL ASSISTANCE ORDERING INFORMATION PARTS IDENTIFICATION Page 48 of 61...
Page 54: ...30A135 ULTRAFRYER MODEL PAR 3 HE GAS FRYER FRONT VIEW Page 50 of 61 18 PAR 3 HE...
Page 61: ...30A135 WIRING DIAGRAMS Page 57 of 61...
Page 63: ...30A135 PAR 3 HE GAS FRYER W COMPUTER Page 59 of 61...
Page 64: ...30A135 PAR 3 HE GAS FRYER W COMPUTER BASKET LIFT Page 61 of 62...
Page 65: ...30A135 THIS PAGE INTENTIONALLY LEFT BLANK Page 61 of 61...