Ultimaker S5 Pro Bundle user manual
16
3.3 Hardware installation
The Ultimaker S5 Pro Bundle will be installed in three stages. First, the Ultimaker S5 will be prepared,
followed by the Material Station. Third, the Air Manager will be mounted. Finish the Pro Bundle installation by
connecting all cables.
Ultimaker S5
1. Remove the clamp clips from the print head and insert the Bowden tubes. The Bowden tubes connect to the
corresponding numbers on the print head.
2. Secure the Bowden tubes with the clamp clips
3. Fit the print head cable clips onto Bowden tube 2 and divide equally
4. Open the glass doors and the two build plate clamps at the front of the build plate
5. Gently slide the glass plate onto the build plate and ensure that it snaps into the build plate clamps at the back
6. Close the two build plate clamps at the front to secure the glass build plate and close the glass doors
Material Station
1. Carefully place the Ultimaker S5 on top of the Material Station
2. Insert a tube coupling collet in the bottom of each feeder of the Ultimaker S5
3. Insert the left Bowden tube of the Material Station into the left feeder, and the right Bowden tube
into the right feeder
4. Secure the Bowden tubes with clamp clips
5. Place the spool holder cap into the hole of the Ultimaker S5’s spool holder
Air Manager
1. Align the mounting bracket with the back of the Ultimaker S5
2. Guide the Bowden tubes and print head cable into both mounting bracket slots. Above feeder 2, make sure that
the Bowden tube is placed in front of the print head cable
3. Gently push down on the mounting bracket until it clicks firmly into place
4. Align the bottom of the filter housing with the slots in the mounting bracket and push it into place
5. Gently push the filter completely into the filter housing
6. From the front of the printer, place the cover over the filter housing
7. Align the hinges with the mounting bracket and drop the cover into place
Connections
1. Connect the Air Manager cable to the port at the back of the Air Manager
2. Place the stress relief clip attached to the mounting bracket around the Air Manager cable and close it
3. Slide the stress relief clip upwards until it cannot go further to secure the cable in place
4. Connect the other side of the Air Manager cable to the
UMB OUT
port on the Material Station
5. Connect the Material Station cable to the
UMB IN
port on the Material Station and the other end to the
UMB
OUT
port on the Ultimaker S5
6. Connect the power extension cable to the Ultimaker S5 and the Material Station
7. Connect the power cable to the Material Station and the other end to a power outlet
Summary of Contents for Ultimaker S5 Pro Bundle
Page 1: ...Ultimaker S5 Pro Bundle Installation and user manual...
Page 5: ...1 Safety and compliance...
Page 9: ...2 Introduction...
Page 14: ...3 Installation...
Page 21: ...4 Operation...
Page 32: ...5 Maintenance...
Page 45: ...6 Troubleshooting...
Page 50: ...7 Warranty...