![TYM T233 HST Service Manual Download Page 209](http://html1.mh-extra.com/html/tym/t233-hst/t233-hst_service-manual_1186866209.webp)
SECTION 5. EARTHING POINT
Fig.10-24
1) Front axle bracket (RH)
Earthed at upper tapped hole in the axle bracket.
3) Earthed at upper tapped hole in the dash panel.
1)Front axle bracket
3) In the dash cover
10-11
3) Earthed at upper tapped hole in the dash panel.
Fig.10-25
Fig.10-26
2) Contact surfaces of the axle bracket and engine
where they tightened together
Summary of Contents for T233 HST
Page 14: ...1 11...
Page 15: ...1 12...
Page 22: ...SECTION 3 GEAR TRAIN DIAGRAMS FIG 1 3 GEAR TRAIN DIAGRAM 1 19...
Page 33: ...SECTION 2 OPERATION CHART FOR DISASSEMBLY AND REASSEMBLY BY MAJOR BLOCKS 2 4...
Page 60: ...3 HST main pump case 4 5...
Page 64: ...6 Hydrostatic system schematic 4 8...
Page 100: ...3 Rear transmission case 5 15 Fig 5 23...
Page 121: ...Power Train Diagram Fig 5 60 5 36...
Page 210: ...SECTION 6 WIRING DIAGRAM 10 12...