The system will not use system work mode 1 and 2 at the same time,
depending on our installation
5.9.
Grid Setup Menu
In the last page of the system work
mode, you can set the days of the
week that the configuration of the
system work operates
In case of being in Spain, set up the variables as on the previous images
5.10.
GEN PORT use Setup Menu
Generator input rated power
: Max power
received by the inverter
(Configurate on 5000W as maximum)
In case of putting inverters in parallel, divide
the maximum power of the generator
between the number of devices connected
in parallel. Set to this value X. 5000W
maximum
GEN connect to grid input
: Generator
connected to Grid
Smart Load Output
: The Gen Port is used as
output load when the SOC of the battery
and solar production are above a
programmed value: e.g. Power=500W, ON:
100%, OFF=95% When the production
exceeds 500W and the SOC reach 100%, it