In this way, we have a series of critical loads connected to the Load output (up
to a maximum of 5 kW) that will allow the panels and / or batteries to supply them
with energy despite a grid failure. The rest of the loads above 11kW must be
connected on the grid side.
In the case of not needing to connect critical loads and wanting to simplify the
installation, all the loads can be put on the grid side as follows (but in the event
of a grid failure, the loads are left without supply even though there is generation
photovoltaic and / or battery):
Smart
Meter