5.13.
Threephase installation with three monophase inverters
5.14.
Device Info Setup Menu
1.
Select all three inverters as master
2.
Do not select
‘’Parallel’’
3.
Choose a Modbus number for each one (they
must be different)
4.
Choose a diferent phase for each inverter
5.
In case of including Meters, select the option
Ex_Meter For CT. The phase of each Meter must
be the same of the one of the inverter
connected to.