5.3
DC wiring
The series of photovoltaic panels shall be carried out as indicated in section 4.1.
The cabinet already has the right protections installed for continuous sockets.
To access the connections, open the back door of the SunBox cabinet. It is very
important to note that each positive must be connected to its negative in the
cabinet, for this it is recommended to mark the cables or make connections one
at a time until the installation is complete.
5.4
AC wiring
To connect Grid and Load open the back door of the SunBox cabinet and
connect to the pointed and identified terminals with colors, phase gray, neutral
blue, yellow and earth green.