UV Reactor (UVR)
Trojan
UV
Logic
TM
Operations & Maintenance
May 25, 2004
4-1
4
UV REACTOR (UVR)
4.1 Introduction
Description
The TrojanUVLogic
TM
UV Reactor (UVR) is of
welded construction and is manufactured from
stainless steel 316L tubing. All wetted surfaces
of the UVR are manufactured from Type 316L
stainless steel, Type 214/219 Quartz or suitable
food-grade UV resistant materials.
The UVR is provided with standard flanged
fittings for hookup to plant piping (150# ANSI
flanges in North America, DIN Flanges in
Europe or an optional sanitary flange for Europe
or North America – availability depending on the
model). On the smaller capacity units (01_M to
08_S/_L), the supported piping connected to the
UVR flanges is sufficient to support the UVR,
however, bolt on brackets are available if
requested by the site. On the larger units (12_S-
30_L), brackets are required and come standard
with each UVR. Each UVR is provided with a
drain port fixed to the outer wall.
Flow enters parallel to the Lamps and exits
through a flange located perpendicular to the UV
Lamps.
Each UVR is designed for a maximum operating
pressure of 150 psi (10 Bar) and has been
hydrotested to 225 psi (15 Bar) prior to
shipment. A hydrostatic pressure test certificate
is furnished with each UVR.
The UVR is designed to accept its respective UV
Lamps and Quartz sleeves through only one end
of the vessel. This end of the UVR shall allow
for complete UVR entry so internal inspection
and/or service can be accomplished. All service
to the UVR is from this end.
For all Midflow models, the Lamp Holder and
Sleeve Bolt provide protection at the service end
for the ends of the Lamps, Lamp connector
plugs, and wiring. For all Short & Long Lamp
models, the ends of the Lamps, Lamp connector
plugs, wiring, and cleaning system drive (if
applicable) are protected at the service end by
the End Cap.
Inlet Flange
(ANSI or DIN)
Conduit
Conduit
Support
Bracket
UV Sensor
Connection
Bolt –On End Plate
(20+cm dia. Models)
UVR Support
Brackets
Drain Port
UV Sensor
Outlet Flange
(ANSI or DIN)
End Cap
Summary of Contents for Aquafine TrojanUVLogic Series
Page 10: ...PREFACE TrojanUVLogicTM Operations Maintenance ii ...
Page 30: ...TROJANUVLogic TM ...
Page 32: ...Introduction to UV Theory Trojan ogicTM Operations Maintenance 1 ii UVL ...
Page 34: ...Introduction to UV Theory Trojan ogicTM Operations Maintenance 1 iv UVL ...
Page 39: ...System Overview Chapter 2 SYSTEM OVERVIEW Trojan ogic TM Operations Maintenance 2 i UVL ...
Page 40: ...System Overview Trojan ogic TM Operations Maintenance 2 ii UVL ...
Page 42: ...System Overview Trojan ogic TM Operations Maintenance 2 iv UVL ...
Page 48: ...TROJANUVLogic TM ...
Page 50: ...Start Up Shut Down Procedures TrojanUVLogic TM Operations Maintenance 3 ii ...
Page 52: ...Start Up Shut Down Procedures TrojanUVLogic TM Operations Maintenance 3 iv ...
Page 56: ...UV Reactor UVR TrojanUVLogic TM Operations Maintenance May 25 2004 4 ii ...
Page 58: ...UV Reactor UVR TrojanUVLogic TM Operations Maintenance May 25 2004 4 iv ...
Page 74: ...UV Reactor UVR TrojanUVLogic TM Operations Maintenance May 25 2004 4 16 ...
Page 76: ...Mechanical Wiping Systems Optional TrojanUVLogic TM Operations Maintenance May 25 2004 5 ii ...
Page 78: ...Mechanical Wiping Systems Optional TrojanUVLogic TM Operations Maintenance May 25 2004 5 iv ...
Page 94: ...Mechanical Wiping Systems Optional TrojanUVLogic Operations Maintenance May 25 2004 5 16 ...
Page 95: ...UV Sensor TrojanUVLogic Operations Maintenance May 25 2004 6 i Chapter 6 UV Sensor ...
Page 96: ...UV Sensor TrojanUVLogic Operations Maintenance May 25 2004 6 ii ...
Page 98: ...UV Sensor TrojanUVLogic Operations Maintenance May 25 2004 6 iv ...
Page 102: ...Control Panel CP TrojanUVLogic Operations Maintenance 2006 01 19 7 ii ...
Page 131: ...Control Panel CP TrojanUVLogic Operations Maintenance 2006 1 19 7 27 ...
Page 137: ...Control Panel CP TrojanUVLogic Operations Maintenance 2006 01 19 7 33 ...
Page 138: ...Control Panel CP TrojanUVLogic Operations Maintenance 2006 01 19 7 34 ...
Page 139: ...Control Panel CP TrojanUVLogic Operations Maintenance 2006 01 19 7 35 ...
Page 140: ...TROJANUVLogic TM ...
Page 142: ...Alarms and Troubleshooting TrojanUVLogic TM Operations Maintenance May 25 2004 8 ii ...
Page 144: ...Alarms and Troubleshooting TrojanUVLogic TM Operations Maintenance May 25 2004 8 iv ...
Page 158: ...Installation Instructions TROJANUVLogic TM Operations Maintenance May 25 2004 9 ii ...
Page 160: ...Installation Instructions TROJANUVLogic TM Operations Maintenance May 25 2004 9 iv ...
Page 167: ...Appendix A Warranty TrojanUVLogic TM Operations Maintenance May 25 2004 Appendix A WARRANTY ...
Page 168: ...Appendix A Warranty TrojanUVLogic TM Operations Maintenance May 25 2004 ...
Page 169: ...Appendix A Warranty TrojanUVLogic TM Operations Maintenance May 25 2004 WARRANTY ...
Page 170: ...Appendix A Warranty TrojanUVLogic TM Operations Maintenance May 25 2004 ...
Page 172: ...Appendix A Warranty TrojanUVLogic TM Operations Maintenance May 25 2004 ...
Page 174: ...Appendix B Replacement Parts List TrojanUVLogic TM Operations Maintenance Jan 02 2006 ...
Page 176: ...Appendix B Replacement Parts List TrojanUVLogic TM Operations Maintenance Jan 02 2006 ...
Page 178: ...TROJANUVLogic TM ...
Page 180: ...Appendix C Layout Drawings TrojanUVLogic TM Operations Maintenance May 25 2004 ...
Page 182: ...Appendix C Layout Drawings TrojanUVLogic TM Operations Maintenance May 25 2004 ...
Page 184: ...Appendix D Electrical Drawings TROJANUVLogic TM Operations Maintenance May 25 2004 ...