TrinityHighway.com
8
Revision E November 2020
Trinity Highway Approved Adhesive Anchoring System
A Trinity Highway approved adhesive anchoring system is required to securely anchor crash
cushions. Each approved adhesive kit contains adhesive, studs, nuts, washers and instructions.
Both vertical and horizontal assemblies are possible using an approved adhesive anchoring
system.
Important:
Follow adhesive manufac
turer’s temperature
storage requirements.
Anchor Assemblies
Note:
Read all Trinity Highway approved adhesive instructions before starting.
1)
Prepare the Concrete Foundation
Warning:
Do not allow anchoring adhesive to contact skin or eyes. See material
safety data sheet supplied with adhesive kit for first-aid procedures. Use only in
well-ventilated area. Do not use near open flame.
Warning:
It is the responsibility of the installer to maintain a safe work area
including the use of standard work zone safety equipment & PPE: gloves, safety-
toe shoes, and eye / ear protection.
The anchor bolts (studs) that anchor the REACT 350
®
II system Backup and/or Monorail
sections to the concrete foundation must be those shipped in the kit or of high strength steel
(Grade B7 or SAE-J429 Grade 5) tensile strength. These studs must be set in minimum 28
MPa [4000 psi] concrete. Allow the concrete to cure a minimum of seven days before applying
anchoring adhesive.
2) Drill
Boreholes
Caution:
It is the responsibility of the installer to consult OSHA silica
respiratory standard 29 CFR 1910.134 for debris removal from borehole(s)
and use Trinity Highway approved adhesive to achieve optimum tensile
strength. Do not use diamond drill bits for drilling boreholes.
Use the part that is to be anchored as a drilling template. Use a rotary hammer drill to drill the
boreholes 1/8” [3 mm] larger than the stud diameter to the recommended depth. See the
approved adhesive instructions provided with your kit. Check to ensure all boreholes are
drilled to the proper depth and aligned with the part to be anchored per table below.
Anchor Drilling Information
Anchor Size:
Bit Size
Drilling Depth
Torque
Medium
3/4”x 7 1/2"
22 mm [7/8”]
160 mm [6 1/4”]
Manufacturer Spec
Concrete
3/4”x 18"
22 mm [7/8”]
420 mm [16 3/4”]
15 N-m [10 ft-lb]
Asphalt
Important:
When mounting on asphalt, initial torque shall be as shown
above. Due to the properties of asphalt, anchors may loosen over time. For
this reason Trinity Highway recommends anchoring to asphalt only at
temporary locations. It is recommended to re-torque anchors in asphalt
every six months to the recommended torque specification.
Summary of Contents for REACT 350 II
Page 1: ......
Page 39: ...TrinityHighway com 38 Revision E November 2020 REACT 350 II TL 3 w Concrete Backup R626C036U...
Page 40: ...TrinityHighway com 39 Revision E November 2020 Transition Assembly SC BU UNI 117815...
Page 41: ...TrinityHighway com 40 Revision E November 2020 Transition Assembly SC BU N 616120...
Page 42: ...TrinityHighway com 41 Revision E November 2020 Transition Assembly SC BU N w Rub Rail 117827...
Page 43: ...TrinityHighway com 42 Revision E November 2020...
Page 44: ...TrinityHighway com 43 Revision E November 2020...
Page 45: ...TrinityHighway com 44 Revision E November 2020 Base Track Assembly 36 Wide Units 605028...
Page 46: ...TrinityHighway com 45 Revision E November 2020...
Page 48: ...TrinityHighway com 47 Revision E November 2020...
Page 49: ...TrinityHighway com 48 Revision E November 2020...
Page 50: ...TrinityHighway com 49 Revision E November 2020 Transition Assembly w Concrete Backup 616084...
Page 52: ...TrinityHighway com 51 Revision E November 2020...
Page 53: ...TrinityHighway com 52 Revision E November 2020...
Page 54: ...TrinityHighway com 53 Revision E November 2020 Nose Cover Assembly TL 3 617967...
Page 55: ...TrinityHighway com 54 Revision E November 2020 Chain CYL Connector Assembly 606182...
Page 56: ...TrinityHighway com 55 Revision E November 2020...
Page 57: ...TrinityHighway com 56 Revision E November 2020 Cable Assemblies 605780...
Page 58: ...TrinityHighway com 57 Revision E November 2020...
Page 59: ...TrinityHighway com 58 Revision E November 2020 Reflector Assembly White Amber Side 613705...
Page 60: ...TrinityHighway com 59 Revision E November 2020 Misc Hardware 611324...
Page 61: ...TrinityHighway com 60 Revision E November 2020 Debris Cover Assembly 36 606715...
Page 62: ...TrinityHighway com 61 Revision E November 2020 Debris Cover Assembly 36 606716...
Page 63: ...TrinityHighway com 62 Revision E November 2020 Debris Cover Assembly 618102...
Page 64: ...TrinityHighway com 63 Revision E November 2020 Drivable Pile Anchor DPA 607938...
Page 65: ...TrinityHighway com 64 Revision E November 2020 Sign Post Assembly 115254...
Page 66: ...TrinityHighway com 65 Revision E November 2020 NOTES...
Page 67: ...TrinityHighway com 66 Revision E November 2020 NOTES...
Page 68: ......