Inspect Shipment
Before assembling the REACT 350
®
II at a specified location, check the received parts against
the shipping list supplied with the system. Make sure all parts have been received. The system is
shipped assembled. All assembly hardware can be found in the last Cylinder. The Pullout
Assembly should be stored for post impact use.
Assembly
Note:
The drawing assembly package provided with the REACT 350
®
II
must be used with
these instructions for proper assembly and should take precedence over these general
instructions.
1) Deploy Traffic Control
A traffic control plan appropriate to the complexity of the project should be prepared and
understood by all parties before the REACT 350
®
II is assembled. Follow the plan set forth by
the highway authority specifying the use of this system.
Deploy the appropriate work zone safety devices prior to beginning the assembly and keep
them present through all phases of deployment.
Warning:
The correct safety equipment and traffic management system
approved by the requisite highway authority must be used as required for any
assembly using the REACT 350
®
II.
2) Determining the Base Point & Centerline
Typically the base point of the REACT 350
®
II will be the midpoint of the road obstacle at its
front face. Offsetting the System may change if bidirectional traffic or expansion joints are
present (p. 17).
Extend a chalk line from the base point, perpendicular to the roadside obstacle face, or as
determined by project engineer, to a distance greater than the maximum length of the REACT
350
®
II (refer to the drawings provided). This chalk line will become the centerline for the
REACT 350
®
II (Figure 14).
Figure 14
Placement on Centerline
Obstacle
90
○
Centerline
Summary of Contents for REACT 350 II
Page 1: ......
Page 39: ...TrinityHighway com 38 Revision E November 2020 REACT 350 II TL 3 w Concrete Backup R626C036U...
Page 40: ...TrinityHighway com 39 Revision E November 2020 Transition Assembly SC BU UNI 117815...
Page 41: ...TrinityHighway com 40 Revision E November 2020 Transition Assembly SC BU N 616120...
Page 42: ...TrinityHighway com 41 Revision E November 2020 Transition Assembly SC BU N w Rub Rail 117827...
Page 43: ...TrinityHighway com 42 Revision E November 2020...
Page 44: ...TrinityHighway com 43 Revision E November 2020...
Page 45: ...TrinityHighway com 44 Revision E November 2020 Base Track Assembly 36 Wide Units 605028...
Page 46: ...TrinityHighway com 45 Revision E November 2020...
Page 48: ...TrinityHighway com 47 Revision E November 2020...
Page 49: ...TrinityHighway com 48 Revision E November 2020...
Page 50: ...TrinityHighway com 49 Revision E November 2020 Transition Assembly w Concrete Backup 616084...
Page 52: ...TrinityHighway com 51 Revision E November 2020...
Page 53: ...TrinityHighway com 52 Revision E November 2020...
Page 54: ...TrinityHighway com 53 Revision E November 2020 Nose Cover Assembly TL 3 617967...
Page 55: ...TrinityHighway com 54 Revision E November 2020 Chain CYL Connector Assembly 606182...
Page 56: ...TrinityHighway com 55 Revision E November 2020...
Page 57: ...TrinityHighway com 56 Revision E November 2020 Cable Assemblies 605780...
Page 58: ...TrinityHighway com 57 Revision E November 2020...
Page 59: ...TrinityHighway com 58 Revision E November 2020 Reflector Assembly White Amber Side 613705...
Page 60: ...TrinityHighway com 59 Revision E November 2020 Misc Hardware 611324...
Page 61: ...TrinityHighway com 60 Revision E November 2020 Debris Cover Assembly 36 606715...
Page 62: ...TrinityHighway com 61 Revision E November 2020 Debris Cover Assembly 36 606716...
Page 63: ...TrinityHighway com 62 Revision E November 2020 Debris Cover Assembly 618102...
Page 64: ...TrinityHighway com 63 Revision E November 2020 Drivable Pile Anchor DPA 607938...
Page 65: ...TrinityHighway com 64 Revision E November 2020 Sign Post Assembly 115254...
Page 66: ...TrinityHighway com 65 Revision E November 2020 NOTES...
Page 67: ...TrinityHighway com 66 Revision E November 2020 NOTES...
Page 68: ......