TrinityHighway.com
36
Revision E November 2020
Post-Impact Instructions and Drawings
1. Deploy the appropriate
traffic control
devices to protect your crew.
Warning:
Locally approved personal safety equipment and traffic management
must be used for walk-up inspections.
2. All anchor bolts have remained firmly anchored in the roadway surface and in the Concrete
Backup, if applicable. Replace any anchors that are loose, broken, or pulled out.
If the system is anchored to asphalt, up to 10% of the total anchors may be replaced if
damaged. If more than 10% of the anchors are damaged, the system should be relocated
to fresh, undisturbed asphalt and redeployed using the 460 mm [18”] threaded rods.
3. Clear and dispose of any debris inside the cylinders and on site.
4. Check the condition of the Cylinders. Any Cylinder that is cracked or otherwise damaged
should be replaced. Measure the minor axis of the Cylinders. Cylinders require
replacement when the minor axis of the Cylinders measures 460 mm [18”] or less (p. 34).
5. The REACT 350
®
II must be pulled out to its original length after each impact. The Pullout
Assembly must be attached prior to this procedure and removed and stored when finished
(Figure 30).
Figure 30 - Pullout Assembly
3/4" x 7 1/2" Stud
PN 117541
3/4" x 2" Heavy Flat Washer
PN 118027
3/4" Eye Nut
PN 115906
Backing Tube
PN 616407
1/2"x4"x4" Bar Washer
PN 609236
3/4" Nut
PN 3704G
Summary of Contents for REACT 350 II
Page 1: ......
Page 39: ...TrinityHighway com 38 Revision E November 2020 REACT 350 II TL 3 w Concrete Backup R626C036U...
Page 40: ...TrinityHighway com 39 Revision E November 2020 Transition Assembly SC BU UNI 117815...
Page 41: ...TrinityHighway com 40 Revision E November 2020 Transition Assembly SC BU N 616120...
Page 42: ...TrinityHighway com 41 Revision E November 2020 Transition Assembly SC BU N w Rub Rail 117827...
Page 43: ...TrinityHighway com 42 Revision E November 2020...
Page 44: ...TrinityHighway com 43 Revision E November 2020...
Page 45: ...TrinityHighway com 44 Revision E November 2020 Base Track Assembly 36 Wide Units 605028...
Page 46: ...TrinityHighway com 45 Revision E November 2020...
Page 48: ...TrinityHighway com 47 Revision E November 2020...
Page 49: ...TrinityHighway com 48 Revision E November 2020...
Page 50: ...TrinityHighway com 49 Revision E November 2020 Transition Assembly w Concrete Backup 616084...
Page 52: ...TrinityHighway com 51 Revision E November 2020...
Page 53: ...TrinityHighway com 52 Revision E November 2020...
Page 54: ...TrinityHighway com 53 Revision E November 2020 Nose Cover Assembly TL 3 617967...
Page 55: ...TrinityHighway com 54 Revision E November 2020 Chain CYL Connector Assembly 606182...
Page 56: ...TrinityHighway com 55 Revision E November 2020...
Page 57: ...TrinityHighway com 56 Revision E November 2020 Cable Assemblies 605780...
Page 58: ...TrinityHighway com 57 Revision E November 2020...
Page 59: ...TrinityHighway com 58 Revision E November 2020 Reflector Assembly White Amber Side 613705...
Page 60: ...TrinityHighway com 59 Revision E November 2020 Misc Hardware 611324...
Page 61: ...TrinityHighway com 60 Revision E November 2020 Debris Cover Assembly 36 606715...
Page 62: ...TrinityHighway com 61 Revision E November 2020 Debris Cover Assembly 36 606716...
Page 63: ...TrinityHighway com 62 Revision E November 2020 Debris Cover Assembly 618102...
Page 64: ...TrinityHighway com 63 Revision E November 2020 Drivable Pile Anchor DPA 607938...
Page 65: ...TrinityHighway com 64 Revision E November 2020 Sign Post Assembly 115254...
Page 66: ...TrinityHighway com 65 Revision E November 2020 NOTES...
Page 67: ...TrinityHighway com 66 Revision E November 2020 NOTES...
Page 68: ......