TracVision M5/M7 User’s Guide
42
Chapter 3 - Settings
8. Wait at least 15 minutes before proceeding. Disregard
messages on the TV stating the test is complete; you
must wait 15 minutes before proceeding.
9. After waiting 15 minutes, repeat Steps 5-7 to run a
second Check Switch test.
10. Verify the values on your TV match those required for
DISH 1000/61 mode (see Figure 3-14). If your values do
not match, turn off the antenna, then turn it back on
and repeat Steps 5-9.
Figure 3-14 DISH 1000/61 Results on TV Screen
11. Exit the menu and allow the receiver to download the
program guide.
NOTE: You do not need to perform this procedure again unless you add
another receiver, you reconfigured a receiver(s) for home use, or you move to a
different DISH 1000 satellite coverage area (see Figure 3-10 on page 38).
Port
1
2
3
Satellite
119
110
61
Trans
OK
OK
OK
Status
Reception Verified
Switch
SW64
Please be patient. The Check Switch test takes approximately 15
minutes to complete. Disregard any messages on the TV stating
the test is complete; the antenna must perform additional
operations before proceeding.
IMPORTANT!