Chapter 2.
INSTALLATION WORK
Preparations for Installation ..................................................... 64
2.1.1 Arrangement of Workers ............................................... 64
2.1.2 Setting-up of Unpacking and Carrying-in Tools ............. 64
2.1.3 Preparation of Piping ..................................................... 64
Installation Work ...................................................................... 65
2.2.1 Positioning of the Weaving Machine ............................. 65
2.2.2 Jobs to be Done before Securing the Legs of the
Weaving Machine .......................................................... 65
2.2.3 Installation ..................................................................... 65
2.2.4 Wiring and Piping to Weaving Machines ....................... 70