
4
2.2.1 Positioning of the Weaving Machine ................................................................................... 65
2.2.2 Jobs to be Done before Securing the Legs of the Weaving Machine.................................. 65
2.2.3 Installation ........................................................................................................................... 65
2.2.4 Wiring and Piping to Weaving Machines ............................................................................. 70
Chapter 3. PREPARATIONS FOR WEAVING START-UP
3.1.1 Mounting the Warp Beam(s) and Procuring Warp Yarn ...................................................... 74
3.1.2 Preparing the Droppers ....................................................................................................... 78
3.1.3 Preparing the Healds........................................................................................................... 79
3.1.4 Preparing the Reed and Drawing in Warp........................................................................... 81
3.1.5 Preparations for Selvage Construction ................................................................................ 83
3.1.6 Preparations for Waste Selvage Device .............................................................................. 86
3.3.1 Lubricants ............................................................................................................................ 89
3.3.2 Cleaning Oil and Sealant..................................................................................................... 93
4.1.1 Nominal Reed Space and Effective Drawing-in Width......................................................... 96
4.1.2 Machine Weight (excluding EDP)........................................................................................ 96
4.1.3 Yarn Number Count of Warp ............................................................................................... 97
4.1.4 Picking Density .................................................................................................................... 97
4.1.5 Warp Tension Setting Range .............................................................................................. 97
4.1.6 Possible Weaving Range (Yarn density vs. Yarn number count) ........................................ 97
4.1.7 Fabric Examples.................................................................................................................. 98
4.2.1 Scope of your work.............................................................................................................. 99
4.2.2 Network Connection Concept............................................................................................ 101
4.2.3 Network Design ................................................................................................................. 103
4.2.4 Piping Work ....................................................................................................................... 111
4.2.5 Wiring Sample Diagram..................................................................................................... 113
4.2.6 Network Cable Connector Installation Method .................................................................. 114
4.2.7 Network Cable Connection to JAT710 .............................................................................. 117
4.2.8 Connection with Customer’s Network................................................................................ 118