– 136 –
18 TG sensor
TGc: Green
TGb: Red
TGa: Yellow
∗
Attachment
Mount these sensors on the directly arranged part of the
header connecting pipe at gas side so that the cabinet turns
toward the front side and the sensors turn toward upper
cabinet.
NOTE
When mounting the sensors, check paint color of the sensor
lead tube part and the pipe color. Mount the sensors to the
position of same color.
NOTE
At working time (finish time), be sure not to
damage the cover of the sensor lead wire with
edge of sheet metal, etc.
If the cover of the sensor lead wire is
damaged, it is dangerous because an electric
shock or fire may be caused.
NOTE
After replacing of parts, check the sensors are
mounted at the specified positions.
If there are incorrect mounted positions,
control of the product does not operate
correctly and a trouble may be caused.
19 Sensor
wiring
process
• Using bundling band, bind PMV coil (Green to Yellow)
with Tga to Tge.
• For Td sensor, bind the case thermo and reactor lead by
bundling band.
NOTE
Using the bundling band being on the market, be sure to bind
the position which was bound.
No. Part name
Procedure
Remarks
Detail G
TGc: Green
TGb: Red
TGa: Yellow
Detail G
Bundling band
PMV coil (Green to Yellow)
TGa to TGd sensors
Pass TG sensor through the
upper side of connecting pipe of
PMV unit (Green) and then bind
it with lead wire of PMV coil.
Bundling band
Td sensor
Case thermo
Reactor lead