– 134 –
12 4-way valve
coil
∗
Attachment
Mount 4-way valve coil so that the label side directs upper
side of the cabinet.
13 PMV
Coil: Blue
Coil: Green
Coil: Red
Coil: Yellow
1. Detachment
1)Perform work of Detachment 1 of 1 .
2)Turn the coil clockwise (counterclockwise) and then
remove it from PMV main unit. (All 3 pcs.)
2. Attachment
1)Mount the PMV coil so that the coil lead wire taking-out
part directs downward.
CAUTION
Coil: Mount yellow coil only so that lead wire taking-out part
directs upward.
2)Match the positioning projection of coil with the concave
part of PMV unit surely and fix it.
No. Part name
Procedure
Remarks
Detail A
Label
4-way valve coil
4-way valve unit
Concave part of PMV
Projection of PMV coil
PMV sideways
Taking-off direction
Turn clockwise
(counterclockwise)
Detail B
Detail A
Detail B
Coil: Green
Coil: Red
Coil: Yellow